1. Custom Electrical Design
We worked closely with architects to create systems tailored to the hotel’s needs, including:
-
- Energy-efficient lighting to lower running costs
- Smart room controls for guest convenience
- Flexible power setups for conference rooms
- Specialized systems for the rooftop bar and restaurant
2. Power for the Tower Crane
The construction team needed a constant, reliable power supply for the tower crane during the build.
3. Relocating a Live Substation
A live electricity network substation had to be moved without cutting power to nearby properties.
4. COVID-19 Pandemic
The project was impacted by the COVID-19 pandemic, which required changes in how we worked to keep everyone safe while staying on schedule.